SystemsSectorsLocationsPortfolioPrice guideSuite builderContact and form
Architect's desk seen from above with rolled drawings, a hotel floor plan with a sauna drawn on it, a cedar sample, a small glass sample, a printed spec sheet and a cup of coffee

Specification · Hotels

A hotel wellness level written as a specification: loads, weights, air paths and clashes

One sample level, set out the way an MEP consultant needs it: two 8-seat glass cabins, a hot and cold pair of pools and two square plunges, with figures first, assumptions stated and the interfaces split between you and us.

Specification · 9 min ·

A worked example, not a fixed offer: an indoor, shaded level with its plant room on the same floor, drawn on a 400 V three-phase supply. The supply is confirmed at survey, and every figure is recalculated for your layout.

The sample level on one table

ElementQtySize and rating
8-seat glass cabin23.0 × 2.3 m inside (6.9 m²), 2.2 m high; Harvia 15 kW (3-phase)
Hot and cold pair1Warm pool 1.6 × 1.2 m, 1,300 L, 38 °C; cold pool 1.2 × 1.2 m, 1,100 L, 3–5 °C
Square plunge21.2 × 1.2 m, 1,100 L, 3–5 °C each
Chiller, 4 HP (nominal table)3One per cold pool, about 3.6 kW each while the compressor runs
Warm pool heater1Power fixed in the layout; see the energy sum below
Indicative range, whole level$106.1–170k (SAR 398–638k)

The nominal table gives the least machine for a shaded, covered site; an outdoor plant room or a poor air path earns a margin, as chiller sizing at 45 °C shows.

Connected load, and line currents by supply voltage

ItemQuantity × ratingTotal kWLine current, three-phase 400 V
Cabin heater, Harvia 15 kW2 × 15 kW30.043.3 A (21.7 A each)
4 HP chiller3 × 3.6 kW10.815.6 A (5.2 A each)
Subtotal40.858.9 A
Warm pool heater, pumps, UV or ozone, controls, lightingFrom the equipment scheduleAdded in the layout

Line current is kW × 1000 ÷ (√3 × line voltage). It is exact for resistive heaters and a floor for chillers and pumps, because motors draw more than the formula says: take the data-plate current when it arrives, and check that each plate shows the frequency of your supply (see heaters and chillers on 60 Hz). Supply voltage is a project variable, so the next table gives the subtotal on each state's published supply.

StatePublished low-voltage supplySubtotal per phase
Saudi Arabiaolder 127/220 V still in use; moving to 230/400 V (SASO, Resolution No. 425)107.1 A at 220 V; 58.9 A at 400 V
Qatar240/415 V ±6%, three-phase four-wire (Kahramaa wiring code, 2016)56.8 A at 415 V
Kuwait240 V household standard (US ITA, 2026); three-phase confirmed at surveySet at survey
Bahrain400/230 V low-voltage network (EWA)58.9 A at 400 V
Oman415/240 V ±6%, three-phase four-wire (OES-4, 2019)56.8 A at 415 V

IEC 60335-2-53:2011, in its EN edition consolidated to 2023, covers electric sauna heating appliances with a rated power input not exceeding 20 kW, for homes and for public saunas in hotels and similar premises. At 15 kW each, both cabin heaters sit inside that scope; a cabin above 20 kW, such as our 12-seat size at 24 kW, takes two 12 kW heaters.

The warm pool is energy first and power second. Heating 1,300 L from 20 to 38 °C takes 1,300 × 4.186 × 18 ÷ 3,600 = 27.2 kWh. That is energy, not a heater size: 12 kW would take 2.3 hours before losses, 18 kW 1.5 hours. The layout fixes the power from the heat-up time you want and the losses of the pool and its cover; reserve a placeholder on the board until then.

4.6 tonnes of water: weights by pool and the slab

PoolWaterSurfaceWater load
Warm pool, 1.6 × 1.2 m1,300 L (1.3 t)1.92 m²677 kg/m²
Cold pool of the pair, 1.2 × 1.2 m1,100 L (1.1 t)1.44 m²764 kg/m²
Two square plunges2 × 1,100 L (2.2 t)2 × 1.44 m²764 kg/m² each
Whole level4,600 L (4.6 t)6.24 m²737 kg/m² on average

Water only: shells, finishes, bathers and furniture come on top, and each cabin is a separate timber load whose weight you should ask for in the equipment schedule. The structural engineer needs the recess depths (0.8 to 0.85 m of water plus the shell) at concept stage.

Heights, air paths, drains and finishes

  • Cabins. 2.2 m high inside, with the roof panel and the ventilation outlet above: measure the clear height under beams, ducts and sprinkler pipes before positions are fixed.
  • Cabin air. A low inlet and a high outlet to a duct or void, one route per cabin; a cabin is never sealed against the room.
  • Pool hall air. The warm pool is a 1.92 m² surface at 38 °C, and the cabins add heat: give the HVAC engineer both, with the cover policy, and ask for the humidity and cooling loads (the glass-front note gives the cabin's share).
  • Drains. A floor drain at each pool edge and cabin threshold, a gully in the plant room, and a discharge point for filter rinse water and for emptying a pool (1.1 or 1.3 t each). Check the building's drain invert against the pool drain level; if gravity cannot serve it, the design needs a pump-out. Floors fall to the drains, never toward a cabin door.
  • Finishes. Cabins in red cedar or thermo-aspen; pool linings in glass or porcelain mosaic, tile or stone with travertine coping; non-slip floors; on a coastal site 316 stainless fixings and coated condenser coils. Sign off samples before production.

Plant room position and the air path for three chillers

  • Next to the pool hall, on the same level, with the shortest run of pipe you can draw; pipe gains heat by the metre, so runs are insulated.
  • In shade, with a ducted air path. Every kilowatt a chiller draws leaves the plant room as heat, with the heat taken out of the water; three machines draw up to about 10.8 kW. Give each an intake and an exhaust that cannot short-circuit, and ask the manufacturer for its clearance diagram.
  • One isolator per machine, so a chiller can be serviced while the others run, and a service door to the back-of-house route, never to the pool deck.
  • Sound. A solid wall between plant and guest areas, isolating mounts under the machines and a noise target at the pool edge from the acoustic consultant.
City hotel rooftop wellness deck at blue hour with two glass-fronted saunas, two small cold plunge pools in a limestone deck and white loungers
A hotel level: two cabins, a pair and plunges
A row of plain black chiller casings on a test bench with a technician and a gauge set
Chillers on the test bench before they ship

Eight clashes to clear before the pools are poured

  1. Three chillers along one wall, each exhausting into the next one's intake.
  2. Sprinkler pipes or luminaires inside a cabin's ventilation void.
  3. Smoke or heat detectors in or above a cabin: ask the fire engineer which type and where, since cabin air is far hotter than room air.
  4. A pool drain below the building's drain invert.
  5. Recesses poured to the architect's depth instead of the shell's: 0.8 to 0.85 m of water plus the build-up.
  6. A pool-recess membrane that is not lapped to the floor membrane.
  7. A lift, door or corner too small for the cabin panels or the pool pieces.
  8. The warm pool heater missing from the electrical schedule because its size was not fixed.

Split of supply: the consultant's package and ours

Consultant and main contractorWe supply
Recesses formed and waterproofed to our drawing; slab loads checkedPool linings, finishes, steps, handrails, circulation, filtration and the rim display
Power to the plant-room board, a feed and isolator for each cabin, licensed connectionsCabins in numbered panels, glass, Harvia heaters and controllers
Water supply, drains and the permitted discharge pointChillers built for the frequency of your supply, the warm pool heater and plant pipework
HVAC for hall and plant room, fire detection strategy, floor falls and finishesLoads, clearances, an equipment schedule and the commissioning test
Hoisting, the access route and the building-management interface (tell us the signals it expects)Installation supervision, up to 7 days on site

Commissioning sequence and the documents that close it

  1. Power, water and drains live at the plant room; recesses signed off.
  2. Pools filled, circulation and filtration running.
  3. Cabin heaters on: working temperature in about 40 minutes.
  4. Chillers bring each cold pool to its 3–5 °C set point and hold it to ±0.3 °C; readings recorded.
  5. Temperature test signed by the hotel's engineer; the last 20% falls due after the signature.

The closing pack: as-built layout and equipment schedule; manufacturer data and data plates (voltage, frequency, current); the signed temperature report; a care sheet with daily, weekly and monthly tasks; a water-quality log template (water treatment for commercial cold plunges); and warranty terms, two years plus a year of assisted service visits.

Where can the chillers stand if the pool hall has no room beside it?

In a plant room on another level, if the pipe runs stay short and insulated and the room has a ducted air path; a basement with no outside air is the version to avoid. Send the section and we mark the route.

Why is the warm pool heater missing from the load table?

Its size depends on the heat-up time you want and the losses of the pool and its cover, which the layout fixes. The energy sum gives the scale; reserve a placeholder on the board until the layout gives the kilowatts.

Does each cabin and chiller need its own isolator?

We draw one for each, so any item can be switched off for service without closing the level. Your electrical consultant owns the board; we supply the schedule and the loads. See architects and MEP and hotels and resorts.

From the note to your site

Send the level plan and the supply data: we return this schedule recalculated for your hotel

WhatsAppPrice guide